All information pertaining to the Bay Point Harbour Villas Condominium Association can be found on this website
Meeting Notices can be found a the "Meeting Notices" Page USPS Mail cluster boxes have been tentatively scheduled for use by the end of July 2025. For your information, all units with decks installed by the owner or their predecessor in title are required to undergo annual termite treatment in accordance with the governing documents. Damages are the responsibility of the owner. $200.00 will save $50,000 Owners may engage the services of any licensed pest control professional for this purpose. Upon completing their annual service with a licensed pest control contractor, owners may submit the documentation to [email protected].
Additionally, a reminder to Owners to have their HVAC systems and tank water heaters (anode rod replacements) serviced annually. In addition, bleach should be poured down your HVAC condensation line access port monthly.
If water heaters are over 10 years old, they must be replaced to prevent costly damage to your neighbors unit in the event of a failure and potential legal liability. All information is included in the association governing documents. Please read and understand those documents, It is a requirement pursuant to the Florida Statutes.
Additionally, owners should ensure that their outgoing plumbing is inspected or jetted annually by a licensed plumbing contractor in Florida. If the unit is not continuously occupied, those maintenance intervals will be more frequent. Absentee Owners of vacant units must ensure that their property managers inspect the units weekly. Owners’ maintenance requirements can be found in the maintenance declarations and rules and regulations available for download on the “information” page of this website.
2025- 2026 Common Element (Exterior) Projects: 1.) Select Entrance Courtyard Deck Repairs with paint - Continuing Winter 2025- 60% complete 2.) Pressure washing exterior entrance courtyards, stairwell and trash areas- 100% complete 3.) Spring Irrigation System Audit and Repairs - July 2025- 40% complete 4.) 2025 Insurance Appraisal Inspection - October 2025 5.) 2025 Insurance Required Rules and Regulations Compliance Inspections -August/September 2025 6) Spring Pine Straw Mulch - May 2025 - 100% complete 7.) Palm Tree Trimming - 100% complete 8.). Exterior trash receptacle doors/latches repairs and replacements - TBD -Fall 2025 9.) Pine and Oak Tree Trimming - TBD - Spring 2026 10.) Exterior Paint and Sealants - TBD- 2027 ?
Harbour Villas- Internet Wi-Fi INSTRUCTIONS now are on the "Information" Page